contestada

A construction company delivered 40 loads of concrete in 5 days.

What was their rate of work?



A.




B.




C.




D.


Respuesta :

melhunt99
melhunt99 melhunt99
  • 05-11-2016
Well 40 divided by 5 is 8 and you don't have options so I would say 8 loads a day :)
Answer Link

Otras preguntas

Multiply. (x-6)(4x + 3)
Which shows the expression x^2-1/x^2-x
Help with this question, ASAP PLEASE!!
Mellisa is an expert scuba diver.she's down in the Pacific Ocean, looking for a rare type of sunfish. At one point, she is 29 meters below the surface of the wa
Explain the geological processes involved in creating the Old Man of the Mountain rock formation.
The area rectangle,a=1xw is represented by the expression 24x6y15. Which could be the dimensions of the rectangle
Kali runs 10 laps around a track each day. each lap around the is 400 meters. how many days will it take kali to run a total of 12 kilometers.
What is the concept of friendship portrayed in both Society and Solitude and Chapter 1 of Nature
what kind of solid is crystalline boron
what situation would most likely create tension in a story