tyleryates30 tyleryates30
  • 03-08-2022
  • Business
contestada

3. What is the second rule of risk management?

a. Share the risk.

b. Transfer the risk.

c. Avoid the risk.

d. Document the risk.

Respuesta :

yendi888 yendi888
  • 03-08-2022
Avoid the risk(c) because if your doing risk management u need to know what type of risk are there to avoid the risk
Answer Link
willismorgan367 willismorgan367
  • 03-08-2022
Number C is your correct answer for this question
Answer Link

Otras preguntas

Find the lenth of a rectangle prism having a volume of 2,83.5 cubic meters, and height of 9 meters
Match each economic term to its description.
The projectile motion of an object can be modeled using h(t) = gt2 + v0t + h0, where g is the acceleration due to gravity, t is the time since launch, h(t) is t
5. Solve the equation. Show your work. Check your answer. 4y + 5 = – 31
on a weather map, which type of front is shown by a line with triangle points on one side A) warm B) cold C) stationary D) occluded
The area of the square is 25 cm2. What is the formula that shows the length of side b?
"The most dangerous game" is best described as a story about... A.) a conflict between the wealthy and the poverty-stricken B.) a bitter attack on the habits
Convert 8 7/9 to an improper fraction.   A. 56/9   B. 65/9   C. 72/9  D. 79/9
Counting Atoms in Compounds 2. 2SR3(PO4)2. Sr=___. P=___. O=___ 3. 3N4O10. N=___. O=___ 4. 2(NH4)3N. N=___. H=___ 5. 8Cl2O. Cl=__
What is the initial value of the equation shown? y = −2x − 5